Filing - EPA Region 5 Consolidated Response to Petition for Review -- Additional Attachments
ATTACHMENTS
- Attachment 1 - Appendix A - Certified Administrative Record Index Well #3
- Attachment 2 - Appendix A - Certified Administrative Record Index Well #4
- Attachment 3 - Appendix A - Certified Administrative Record Index Well 1
- Attachment 4 - Appendix A - Certified Administrative Record Index Well 2
- Attachment 5 - B-1 FG Permit App 3.2013 pt. 1
- Attachment 6 - B-1 FG Permit App 3.2013 pt. 2
- Attachment 7 - B-1 FG Permit App 3.2013 pt. 3
- Attachment 8 - B-1 FG Permit App 3.2013 pt. 4
- Attachment 9 - B-1 FG Permit App 3.2013 pt. 5
- Attachment 10 - B-1 FG Permit App 3.2013 pt. 6
- Attachment 11 - B-1 FG Permit App 3.2013 pt. 7
- Attachment 12 - B-1 FG Permit App 3.2013 pt. 8
- Attachment 13 - B-1 FG Permit App 3.2013 pt. 9
- Attachment 14 - B-1 FG Permit App 3.2013 pt. 10
- Attachment 15 - B-1 FG Permit App 3.2013 pt. 11
- Attachment 16 - B-1 FG Permit App 3.2013 pt. 12
- Attachment 17 - B-1 FG Permit App 3.2013 pt. 13
- Attachment 18 - B-2 FG Permit App 5.2013 pt. 1
- Attachment 19 - B-2 FG Permit App 5.2013 pt. 2
- Attachment 20 - B-2 FG Permit App 5.2013 pt. 3
- Attachment 21 - B-2 FG Permit App 5.2013 pt. 4
- Attachment 22 - B-2 FG Permit App 5.2013 pt. 5
- Attachment 23 - B-2 FG Permit App 5.2013 pt. 6
- Attachment 24 - B-2 FG Permit App 5.2013 pt. 7
- Attachment 25 - B-2 FG Permit App 5.2013 pt. 8
- Attachment 26 - B-3 Request for Additional Information
- Attachment 27 - B-4 Salinity in Ironton Sandstone
- Attachment 28 - B-5 Response to Request for Additional Information 1.2014
- Attachment 29 - B-6 Response to Request for Additional Information 10.2014
- Attachment 30 - B-7 Testing and Monitoring Table Transmittal
- Attachment 31 - B-8 Response to Question about Pressure Front Tracking
- Attachment 32 - B-9 IL-137-6A-0001 Draft Permit Well 1 Attachment B
- Attachment 33 - B-10 FutureGen Fact Sheet
- Attachment 34 - B-11 FutureGen Statement of Basis
- Attachment 35 - B-12 Request for Additional Information 10.2013
- Attachment 36 - B-13 Response to Request for Additional Information 11.2013
- Attachment 37 - B-14 Memo about Monitoring
- Attachment 38 - B-15 Request for Additional Information 1.2014
- Attachment 39 - B-16 ERRP Request 1.2014
- Attachment 40 - B-17 ERRP Request pt. 2 1.2014
- Attachment 41 - B-18 ERRP Request pt. 3 1.2014
- Attachment 42 - B-19 ERRP Request pt. 4 1.2014
- Attachment 43 - B-20 IR No. 3 Response 1.2014
- Attachment 44 - B-21 T& M 1.2014
- Attachment 45 - B-22 B-23 Injection pressure 1.2014
- Attachment 46 - B-24 Injection pressure pt. 2 1.2014
- Attachment 47 - B-25 Injection pressure pt. 3 1.2104
- Attachment 48 - B-26 Pressure impacts 1.2014
- Attachment 49 - B-27 Pressure impacts pt. 2 1.2014
- Attachment 50 - B-28 FutureGen TM Plan 2-14-14 (3)
- Attachment 51 - B-28 Insurance and trust fund 1.2014
- Attachment 52 - B-29 T & M table 1.2014
- Attachment 53 - B-30 FA and draft plans 1.2014
- Attachment 54 - B-31 AoR delineation and pressure calcs 1.2014
- Attachment 55 - B-32 AoR delineation and pressure calcs pt. 2
- Attachment 56 - B-33 AoR Plan review 2.2014
- Attachment 57 - B-34 T & M and shutdown 2.2014
- Attachment 58 - B-35 Pressure front 2.2014
- Attachment 59 - B-36 Pressure Front Tracking 2.21.2014
- Attachment 60 - B-37 Updated Draft PISC 2.25.2014
- Attachment 61 - B-25 Injection pressure pt. 3 1.2104
- Attachment 62 - B-34 Well Shutdown Procedures 2014
- Attachment 63 - B-35 Pressure front 2.2014
- Attachment 64 - B-36 Pressure Front Tracking 2.21.2014
- Attachment 65 - B-37 Updated Draft PISC 2.25.2014
- Attachment 66 - B-38 PISC 2.2014
- Attachment 67 - B-39 Summary of multiple issues 2.2014
- Attachment 68 - B-40 AoR delineation 2.2014
- Attachment 69 - B-41 AoR delineation issues 3.2014
- Attachment 70 - B-42 AoR delineation pressure deform map 3.2014 AR # 208
- Attachment 71 - B-43 QASP 3.2014
- Attachment 72 - B-44 Notes from 3.3.2014 conference call
- Attachment 73 - B-45 AoR reevaluation 3.2014
- Attachment 74 - B-46 FutureGen_PISC Plan_Rev0
- Attachment 75 - B-46 FutureGen_TM Plan_Rev0
- Attachment 76 - B-46 T & M and PISC plans 3.2014
- Attachment 77 - B-47 T & M Plan 3.2014
- Attachment 78 - B-48 FutureGen_AOR_Plan_Rev0
- Attachment 79 - B-48 FutureGen_QASP_Rev0a
- Attachment 80 - B-48 QASP AoR and CA Plans 3.2014
- Attachment 81 - B-49 QASP plan 3.5.2014
- Attachment 82 - B-50 AoR Nicot method 3.2014
- Attachment 83 - B-51 AoR determination 3.2014
- Attachment 84 - B-51 AoR determination 3.2014
- Attachment 85 - B-52 AoR determination pt. 2
- Attachment 86 - B-53 AoR determination pt. 3
- Attachment 87 - B-54 AoR Birkholzer calcs
- Attachment 88 - B-54 Birkholzer and AOR-Eqn 1 and 2 Pressure-Worksheet-3-3-14 (3)
- Attachment 89 - B-55 AoR Birkholzer calcs pt. 2
- Attachment 90 - B-56 Insurance checklist
- Attachment 91 - B-57 Insurance broker
- Attachment 92 - B-58 Prelim review of insurance policy 3.2014
- Attachment 93 - B-59 Insurance info on aig 3.2014
- Attachment 94 - B-60 Insurance issues 3.14.2014
- Attachment 95 - B-61 Pressure front and AoR maps 3.2014
- Attachment 96 - B-62 Future monitoring well location 3.21.14
- Attachment 97 - B-63 Location of future well
- Attachment 98 - B-63 Location of future well
- Attachment 99 - B-64 Emergency and Remedial Response and Insurance
- Attachment 100 - B-65 AoR Delineation and Corrective Action Report excerpted files
- Attachment 101 - B-65 AoR Delineation and Corrective Action Report March 2014
- Attachment 102 - B-66 Revised trust agreement
- Attachment 103 - B-67 Revised trust agreement pt. 2
- Attachment 104 - B-68 FR insurance and trust fund
- Attachment 105 - B-69 Financial Responsibility report March 2014
- Attachment 106 - B-70 State of IL database website
- Attachment 107 - B-71 EPA Financial Responsibility Guidance
- Attachment 108 - B-72 EPA Area of Review Evaluation and Corrective Action Guidance
- Attachment 109 - B-73 EPA Well Testing and Monitoring Guidance
- Attachment 110 - B-74 Leinberger and Critchelow Declarations Ex 4 & 5 excerpt
- Attachment 111 - B-75 Response To Comments on draft permits
- Attachment 112 - B-76 Email exchange on ISWS data 8.20.2014
- Attachment 113 - B-78 Criswell Plugging 8.14.2014
- Attachment 114 - B-79 Criswell plugging affidavit
- Attachment 115 - B-81 Memo to File Representation of model
- Attachment 116 - B-82 Memo re Pan Handle Waverly 8.28.2014
- Attachment 117 - B-83 Hyromite info
- Attachment 118 - B-84 Memo re ISGS well discussion 6.27.2014
- Attachment 119 - B-85 State well info 6.30.2014
- Attachment 120 - B-86 State well information 7.9.2014
- Attachment 121 - B-34 T & M and shutdown 2.2014
- Attachment 122 - B-34 FutureGen TM Strategy Tables
- Attachment 123 - B-21 Copy of FutureGen TM Strategy Tables pt. 1
- Attachment 124 - B-21 Copy of FutureGen TM Strategy Tables pt. 2
- Attachment 125 - B-87 FG Final Permit Well 1 pt. 1
- Attachment 126 - B-87 FG Final Permit Well 1 pt. 2
- Attachment 127 - B-87 FG Final Permit Well 1 pt. 3
- Attachment 128 - B-87 FG Final Permit Well 1 pt. 4
- Attachment 129 - B-87 FG Final Permit Well 1 pt. 4
- Attachment 130 - B-87 FG Final Permit Well 1 pt. 5
- Attachment 131 - B-87 FG Final Permit Well 1 pt. 6
- Attachment 132 - B-2 FG Permit App 5.2013 pt. 8
Link to Filing (PDF. pages)
EAB Appeal Number(s): UIC 14-68; UIC 14-69; UIC 14-70; UIC 14-71 (Consolidated)
Filing Number: 7
Filing Date: 10/31/2014
Case Name: FutureGen Industrial Alliance, Inc.
The documents provided by the Board are Adobe Acrobat PDF ( Portable Document Format). They can be viewed, and printed, with the use of an Adobe Acrobat Reader. The Adobe Acrobat Reader is available, free, for Unix, Macintosh, IBM DOS, and IBM Windows operating systems. Download the latest version of Adobe Acrobat Reader

